Plastic dowel in sleeper manufacturers take you to understand the correct installation method of road studs
Plastic dowel in sleeper manufacturers take you to understand the correct installation method of road studs
(Summary description)Plastic dowel in sleeper manufacturers introduce bolt spikes as a common railway turnout accessories, often seen in railways, and the role of bolt spikes is also very important. In fact, there are many types of road studs, in addition to bolt road studs, there are other types.
- Categories:Industry news
- Author:
- Origin:
- Time of issue:2022-11-03 11:30
- Views:
Plastic dowel in sleeper manufacturers introduce bolt spikes as a common railway turnout accessories, often seen in railways, and the role of bolt spikes is also very important. In fact, there are many types of road studs, in addition to bolt road studs, there are other types. If divided according to material, road studs can be divided into cast aluminum road studs, plastic road studs, ceramic road studs, glass road studs, reflective road studs, etc. Plastic dowel in sleeper manufacturers have learned that different types of road studs have different characteristics and can be used in different occasions.
1. Placing and installing safety isolation facilities is the top priority. I hope you can't ignore it. During the whole dynamic construction process, the manufacturer of Plastic dowel in sleeper tells you that whether it is a new road or a road that has been opened to traffic, all Everyone should be in the safety facilities, such as construction on the open road, the ratio of safety personnel to installation personnel should be 1:1. The ratio of safety personnel to installation personnel should be 1:3 for the construction of road sections that are not open to traffic.
2. Determine the installation position and ensure that the installation position is flat. For the pavement with expansion and contraction, cracks and unevenness, the pavement should be smoothed in advance.
3. Use a brush to clean the installation location and ensure that the installation location is dry. Take an appropriate amount of glue and spread it evenly on the road stud.
4. The manufacturer of Plastic dowel in sleeper tells you to press the road stud tightly on the installation position to ensure the correct direction. If there is too much glue, be sure to clean it up; if it is a cast aluminum road stud with feet, make sure that the depth of the hole is greater than that of the nail. The depth of the foot is 1cm, and the diameter of the hole is 2mm larger than the diameter of the nail foot.
5. An inspection shall be made within two hours after the installation of road studs to ensure that all road studs are not installed backwards, installed crookedly or pressed crookedly. The plastic dowel in sleeper manufacturer reminds the road stud to be cured for 4 hours before removing and installing the isolation facilities.