The railway fastener manufacturer will take you to understand the precautions for the installation of steel structure bolts

The railway fastener manufacturer will take you to understand the precautions for the installation of steel structure bolts

The railway fastener manufacturer will take you to understand the precautions for the installation of steel structure bolts

(Summary description)Railway fastener manufacturers tell you that bolts are connecting parts of steel structures. According to the bearing capacity, they can be divided into two types: ordinary bolts and high-strength bolts. The following will introduce the precautions in the construction of steel structure bolts.

  • Categories:Industry news
  • Author:
  • Origin:
  • Time of issue:2022-12-08 14:01
  • Views:
Information

Railway fastener manufacturers tell you that bolts are connecting parts of steel structures. According to the bearing capacity, they can be divided into two types: ordinary bolts and high-strength bolts. The following will introduce the precautions in the construction of steel structure bolts.  

Low price railway fastener from China manufacturer
1. For dynamic loads or bolted connections of important parts, spring washers should be placed according to the design requirements, and the spring washers must be set on the nut side.   
2. The installation of high-strength bolts should be able to penetrate the holes freely, and forced penetration is strictly prohibited. The railway fastener manufacturer tells you that the hole diameter of the high-strength bolt-connected steel plate is slightly larger than the bolt diameter, and must be formed by drilling.   
3. Railway fastener manufacturers tell you that high-strength bolt regular connection forms are usually divided into friction connection, tension connection and pressure connection. Among them, friction connection is the basic connection form widely used at present.   
4. The installation sequence of high-strength bolts: it should be carried out from the part with high rigidity to the unconstrained free end. For high-strength bolts on a joint, the initial tightening, retightening, and final tightening should start from the middle of the bolt group and expand to the surroundings one by one. Each tightening should be marked with different colors of paint to prevent leakage. The railway fastener manufacturer tells you that the initial tightening, retightening, and final tightening of high-strength bolts in the same joint should be completed within 24 hours. If there is no specified design, it should be carried out according to the construction process sequence of fastening high-strength bolts first and then welding (that is, first bolting and then welding).

Keyword:

Related news

Ensuring Durability and Stability with Plastic Dowels in Sleeper
Discover how plastic dowels in sleeper systems can provide long-lasting durability and stability for your transportation infrastructure needs.
Everything You Need to Know About Plastic Dowels in Sleepers
Discover the essential information about plastic dowels in sleepers and how they contribute to road safety. From their benefits to their installation process, this article covers everything you need t

Add:No.9, Donghuan Rd., Fuqiao Town, Taicang City, Jiangsu Province, P.R.China

Post code:215434
Tel:0086-512-53703217
Phone:0086-18012719858 

E-mail:18012719858@163.com

Copyright ©2022 Suzhou Sudelan Railway Parts Co., Ltd.